Universal Handlers Forklift Rental & Service
How Do We Work
Action Plan
Before Operation
- Feasibility report,
- Determination of problems such as educational deficiencies,
- Risk analysis,
- Infrastructure of the current facility,
- Operating hours,
- Used fuel,
- Analysis of occupational health and safety conditions,
- Determination of the required materials,
- Work systematic and shifts of the operators,
- Determination of machines and equipments in line with the bearing capacity,
- Current storage system (shelf intervals, maximum heights),
- Checklist (analyzing current operator systems and forklifts).
Operation
- Checking and signing of the contract by the parties,
- Completing the required documents if there is a leasing contract,
- Supplying operator and initial trainings of the operators,
- Fulfilling all the contract terms and conditions,
- Offering spare machine and technician in projects where number of forklifts is above 15,
- Operator to start working,
- Supplying and replacing forklifts,
- Operation responsibility to be initiated with handover papers.
After Operation
- Orientation study with Master person in the project and project information transfer,
- Submitting Universal Handlers documentations to the project (Instructions – procedures – general documents),
- Preparations about reporting,
- Training service, organizing the work system of the operators, time table,
- Forming a service zone in an appropriate place as the number of machines increase,
- Filing, auditing, standardization
- Continuous technician and chief support, constant training,
- Invoicing.








